Station 1
Ceiling & Floor Framing:
- The module is checked to ensure everything is level
- Ceiling and flooring joists are cut to plan
- Brackets are installed on the ceiling and floor rims
Ceiling Framing
- QA check on ceiling framing against plan
- Grind Hilti pins on exterior C-Channel to ensure the heads are flush
- Hilti pins connect lumber to the metal frame
- Install C-Channel firout at the top and bottom
Flooring Framing:
- QA check on ceiling framing against plan
- Cut and install undercarriage netting to hold insulation in place
- Install batons at every other joist
- Install sub floor insulation
- Ensure the mod is plumbed with pull string and come along
- Cut the structural ply sheathing for the sub floor to size
- Install the structural ply sheathing